Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the salient domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6121
Dundas Bridge Interconnecting Watermain – Awards – Varcon Construction Skip to main content
Uncategorized

Dundas Bridge Interconnecting Watermain – Awards

By February 13, 2015No Comments

2013 Infrastructure Concrete Award

Ontario Concrete Awards Logo

 

2014 Project of The Year Award – Structures Category

PP Dundas Bridge_Awards_Page_1

2015 Top Water Projects

PP Dundas Bridge_Awards_Page_2